As part of a large expansion at an energy generating facility in Wisconsin, Coenen Mechanical LLC was responsible for the fabrication, installation and relocation of utility piping. Work included installation of approximately 900 feet of 10” schedule 40 carbon steel pipe, 600 feet of 6” HDPE, 400 feet 4” HDPE, as well as multiple isolation valves, test connections and future tie points. A major facility shut-down was necessary to make the final tie-ins. Through careful planning and execution, the tie-ins were made safely and under the promised time. The project was completed in approximately four months.