Industries We Service

Coenen Mechanical was responsible for installation of a new hydronic piping system with a heat recovery loop. This system was installed as part of an addition to an existing educational building. Tie-ins were made on the chilled water and hot water lines while classes were in session without interruption to the building systems. Many of the tie-ins to the existing system were completed in active offices/classrooms. Significant planning and coordination with other contractors and the owner was required to complete this work without interrupting classes.